The Blog

February 3, 2006

Ham Shack Update 2/3/2006

Some progress with the ham shack project during the past couple of weeks:

It’s painted

Painted Shed

Grounding is ready

grounding
Each of these grounding rods is 8 ft long and they’re about 7ft into the ground.

Working on thermal insulation

thermal insulation
thermal insulation

Tables have surface

table surface


risto posted at 9:20 pm in: Ham Shacks